Blog

  1. 10-Q production figures vs monthly pit volumetrics: where the gap comes from

    How 10-Q production disclosures differ from monthly satellite pit volumetrics, and why the lag between them matters for tracking mine output.

  2. How to spot a production guidance miss before the quarterly report

    Early signs of a production shortfall show up in pit volumetrics months before a mining company's quarterly filing. Here's what to watch for.

  3. Field notes: the Arctic iron ore pit that only moves six months a year

    Why reading a frozen pit means reading two different operations: the stockpile-building season and the shipping season, and the gap in between.

  4. What cut-off grade does to a volumetric production read

    Cut-off grade splits mined tonnes from payable output. Here's why a volumetric read tracks movement, not metal, and what that means for an estimate.

  5. Open-pit vs underground mines: why volumetric monitoring only works for one

    Stereo satellite volumetrics read bench faces and stockpiles from above. Here's why that gives a production read for pits and not for underground mines.

  6. Tonnes milled vs tonnes mined: what the gap tells you

    Why mined tonnes and milled tonnes diverge, and what the gap signals about stockpile draw, mill capacity, and strip ratio shifts.

  7. Field notes: two copper mines, same quarter, opposite signals

    A field note on two copper mines moving opposite directions in the same quarter, and why bench volumetrics caught it first.

  8. Grade control vs. volumetric production estimates: what's the difference?

    Grade control and volumetric estimates answer different questions about a mine. Here's what each measures and why analysts need both.

  9. How to read an ASX quarterly activities report for production guidance

    A working guide to pulling real production signal out of an ASX quarterly activities report, before the next disclosure confirms it.

  10. Care and maintenance: what it means and when output hits zero

    Care and maintenance status explained: what it means for a mine's books, and why reported output and real pit activity rarely hit zero on the same day.

  11. Field notes: a dividend cut, three months after the stockpile told us

    A field-notes look at how a stockpile drawdown flagged a mine output slowdown months before the dividend cut and the quarterly guidance that followed.

  12. NI 43-101 vs JORC: why production disclosure timing differs

    NI 43-101 and JORC set resource reporting standards, not disclosure timing. Here's what drives quarterly production report cadence instead.

  13. How to tell a mine ramping up from one slowing down in satellite imagery

    Bench face counts, haul road extensions, and waste-to-ore cut patterns that signal whether a mine is ramping up or slowing down, ahead of disclosure.

  14. What is bench advance, and why is it the clearest output signal

    Bench advance is the clearest visible read on monthly mine output. What it is, why it beats truck counts and stockpiles, and how to measure it right.

  15. How cloud cover affects a monthly pit volumetric read

    Why an overcast pass breaks a stereo pit volumetric read, what a missed monthly epoch means, and how analysts work around it.

  16. Overburden removal vs. ore extraction: reading the difference in satellite imagery

    Separate waste stripping from ore pulls in stereo satellite passes using bench geometry, dump growth, and haul destination.

  17. Bench vs berm: what's the difference in an open pit mine

    Bench and berm get used interchangeably in pit talk, but they're different structures. Here's what each one is and why the distinction matters.

  18. Can satellite imagery estimate ore grade, and what pit volumetrics actually tell you

    Satellite imagery measures how much rock moved, not what's in it. Here's the real split between grade and tonnage, and where pit volumetrics hit their limit.

  19. How to calculate pit volume from stereo satellite imagery

    How stereo photogrammetry and DEM differencing turn two satellite passes into a pit volume figure, and where the method's real limits sit.

  20. ROM stockpile vs processed ore stockpile: telling them apart in satellite imagery

    How to tell a ROM pad from a product stockpile in VHR satellite imagery, by location, dump pattern, and pile geometry.