Pit volume is the thing you want to know, and production tonnage is the number everyone reports instead. If you're trying to get ahead of a quarterly disclosure, you need a way to measure how much rock has come out of a pit between two dates without waiting for the company to tell you. Stereo satellite imagery is the tool that gets you there, and the math behind it is more straightforward than people assume.

Start with two images, not one

A single satellite pass gives you a flat picture. Stereo photogrammetry needs two images of the same ground, taken from different angles, close enough in time that nothing moved in between except maybe a few trucks. The sensor captures the same bench faces, haul ramps, and stockpiles from two viewpoints, and the parallax between them, the apparent shift in position caused by elevation, is what lets you reconstruct height.

Very high resolution panchromatic imagery at sub-half-metre resolution is what makes this workable at mine scale. At coarser resolution, bench edges blur into the surrounding terrain and the elevation model loses the terracing that matters for volume work.

DEM differencing is the whole trick

Once you have two stereo pairs, one from month one and one from month two, you process each into a digital elevation model, a DEM. Then you subtract one DEM from the other, pixel by pixel. Where the newer surface sits lower than the older one, material has been removed. Where it sits higher, material has been added, which shows up on waste dumps and ROM stockpiles rather than in the pit itself.

Sum the negative differences across the pit footprint, multiply by pixel area, and you get a volume figure in cubic metres for that period. This is DEM differencing, and it's the same core method geomorphologists use to track glacier mass balance or landslide debris, just pointed at a bench face instead of a hillside.

Why bench face volumetrics beats a single snapshot

A lot of people assume you can get pit output from one image if you already know the pit's starting geometry. You can't, not reliably. Benches get mined unevenly, haul roads shift, and stockpile positions change between periods, so a single snapshot tells you what the pit looks like today but nothing about the rate of change. Bench face volumetrics, measuring the actual material loss from working faces month over month, is what ties the imagery to an output estimate rather than a static shape.

The measurement captures movement between two dates: the material that shifted off a bench face or landed on a dump. That's a different thing from a stockpile inventory taken at a single point in time, and it's the number that actually tracks production.

Where the method breaks down

DEM differencing gives you a volume. Converting that to a tonnage, which is what gets compared against a company's quarterly production report, needs a density assumption for the material being moved. Ore density and waste density aren't the same, and neither is constant across a deposit. An analyst applies a reasonable density figure and treats the resulting tonnage as an estimate for comparing against disclosure. It won't line up with the mine's own internal survey, which uses direct measurement and site-specific density data.

This is also why the method works best as a running series rather than a one-off calculation. A single month's volume is one data point. A run of months, taken from the same kind of stereo pairs processed the same way, tells you whether an operation is scaling output up or slowing down, which is usually the question ahead of the next disclosure.

Building the series yourself versus buying it

Running stereo photogrammetry and DEM differencing on a named pit every month is real GIS work: sourcing matched stereo pairs, processing DEMs, aligning them to a common grid, and checking the bench edges before you trust a difference map. Plenty of technical teams do exactly this in-house.

If you'd rather get that monthly cubic-metre series already processed, named by operation, that's what Mine Production Nowcast delivers as a CSV ahead of the company's own quarterly numbers.